Skip to content

Code4rena

Blend V2 Audit + Certora Formal Verification

Every publicly disclosed report for Blend V2 Audit + Certora Formal Verification and what kind of bugs they were.

disclosed reports
21
most reported class
Business logic
bug classes found
2
first disclosure
2025
Find Blend V2 Audit + Certora Formal Verification on bugbounty.fyi Current scope, rewards and status, if it runs a public program.

Disclosed reports

Newest first. Only what Blend V2 Audit + Certora Formal Verification chose to make public.

ReportClassSeverityBountyCVSSVotesDisclosed
Utilization ratio can exceed 100% due to missing validation in withdrawal functions Business logic High – – – 13 Aug 2025
Invalid utilization ratio check, blocking users from submitting a flash loan Business logic Medium – – – 13 Aug 2025
Missing update_rz_emis_data calls in draw and donate functions lead to incorrect emissions distribution Business logic Medium – – – 13 Aug 2025
Removing a pool from the reward zone leads to the loss of ungulped emissions Business logic Medium – – – 13 Aug 2025
Division before multiplication may cause division by zero DOS during low backstop supply DoS Medium – – – 13 Aug 2025
Malicious actors can repeatedly dilute emissions to a longer timeframe Business logic Medium – – – 13 Aug 2025
Edge case breaks APR cap calculation and leads to excessive fee extraction from the pool Business logic Medium – – – 13 Aug 2025
Bad debt can be permanently blocked from being moved to backstop Business logic Medium – – – 13 Aug 2025
Interest auctions enable inflation attacks on backstop vaults, allowing attackers to steal user deposits Business logic Medium – – – 13 Aug 2025
Pools outside of the reward zone can keep receiving Blend tokens Business logic Medium – – – 13 Aug 2025
A reserve’s d_supply is incorrectly updated and stored after flash loan execution Business logic High – – – 13 Aug 2025
User can steal other users’ emissions due to vulnerable claim implementation Business logic High – – – 13 Aug 2025
Flash loans allow borrowing from frozen pools, bypassing security controls Business logic Medium – – – 13 Aug 2025
If a withdrawal executes after a bad debt auction gets created, it could cause the auction to be stuck and further bad debt auctions can’t be created Business logic Medium – – – 13 Aug 2025
Users can create overpriced bad debt and interest auctions by providing duplicate reserves Business logic Medium – – – 13 Aug 2025
Pool’s gulped emissions could be lost if a reserve has no supply Business logic Medium – – – 13 Aug 2025
When code defaults on remaining liability, it does not delete remaining auction, which is problematic if the user has called fill with a % less than 100 Business logic Medium – – – 13 Aug 2025
Fee-vault can be made insolvent in case of defaults Business logic Medium – – – 13 Aug 2025
Missing reserve interest accrual prior to backstop take rate update leads to incorrect backstop_credit computation Business logic Medium – – – 13 Aug 2025
Attackers can maliciously inflate total_supply temporarily to exceed utilization rate limit and push the pool towards 100% util rate, potentially causing a loss of lender funds Business logic Medium – – – 13 Aug 2025
Removal of pool from reward zone does not allow gulping emissions which were already distributed in the past Business logic Medium – – – 13 Aug 2025