EthAssetManager and ThreePoolAssetManager don’t control Meta tokens decimals
The contracts assume meta pool tokens always have 18 decimals when calculating minting slippage, but the token decimals are not controlled. If a meta token has different decimals, minting can become impossible or slippage protection can be bypassed, potentially causing fund loss.
Submitted by hyh
Both contracts treat meta assets as if they have fixed decimals of 18. Minting logic breaks when it’s not the case. However, meta tokens decimals aren’t controlled.
If actual meta assets have any other decimals, minting slippage control logic of both contracts will break up as total is calculated as a plain sum of token amounts.
In the higher token decimals case minTotalAmount will be magnitudes higher than actual amount Curve can provide and minting becomes unavailable.
In the lower token decimals case minTotalAmount will lack value and slippage control will be rendered void, which opens up a possibility of a fund loss from the excess slippage.
Setting severity to medium as the contract can be used with various meta tokens (_metaPoolAssetCache can be filled with any assets) and, whenever decimals differ from 18 add_liquidity uses, its logic be broken: the inability to mint violates the contract purpose, the lack of slippage control can lead to fund losses.
I.e. this is system breaking impact conditional on a low probability assumption of different meta token decimals.
Proof of Concept
Meta tokens decimals are de facto hard coded into the contract as plain amounts are used (L. 905):
ThreePoolAssetManager.sol#L896-L905
function _mintMetaPoolTokens(
uint256[NUM_META_COINS] calldata amounts
) internal returns (uint256 minted) {
IERC20[NUM_META_COINS] memory tokens = _metaPoolAssetCache;
uint256 total = 0;
for (uint256 i = 0; i < NUM_META_COINS; i++) {
if (amounts[i] == 0) continue;
total += amounts[i];
ThreePoolAssetManager.sol#L915-L919
uint256 expectedOutput = total * CURVE_PRECISION / metaPool.get_virtual_price();
uint256 minimumMintAmount = expectedOutput * metaPoolSlippage / SLIPPAGE_PRECISION;
// Add the liquidity to the pool.
minted = metaPool.add_liquidity(amounts, minimumMintAmount);
The same plain sum approach is used in EthAssetManager._mintMetaPoolTokens:
uint256 total = 0;
for (uint256 i = 0; i < NUM_META_COINS; i++) {
// Skip over approving WETH since we are directly swapping ETH.
if (i == uint256(MetaPoolAsset.ETH)) continue;
if (amounts[i] == 0) continue;
total += amounts[i];
When this decimals assumption doesn’t hold, the slippage logic will not hold too: either the mint be blocked or slippage control disabled.
Notice, that ThreePoolAssetManager.calculateRebalance do query alUSD decimals (which is inconsistent with the above as it’s either fix and control on inception or do not fix and accommodate the logic):
ThreePoolAssetManager.sol#L338-L338
decimals = SafeERC20.expectDecimals(address(alUSD));
Recommended Mitigation Steps
If meta assets are always supposed to have fixed decimals of 18, consider controlling it at the construction time.
I.e. the decimals can be controlled in constructors:
for (uint256 i = 0; i < NUM_META_COINS; i++) {
_metaPoolAssetCache[i] = params.metaPool.coins(i);
if (_metaPoolAssetCache[i] == IERC20(0xEeeeeEeeeEeEeeEeEeEeeEEEeeeeEeeeeeeeEEeE)) {
_metaPoolAssetCache[i] = weth;
+ } else {
+ // check the decimals
}
}
ThreePoolAssetManager.sol#L254-L256
for (uint256 i = 0; i < NUM_META_COINS; i++) {
_metaPoolAssetCache[i] = params.metaPool.coins(i);
+ // check the decimals
}
In this case further decimals reading as it’s done in calculateRebalance() is redundant.
Otherwise (which is less recommended as fixed decimals assumption is viable and simplify the logic) the meta token decimals can be added to calculations similarly to stables:
ThreePoolAssetManager.sol#L779-L779
normalizedTotal += amounts[i] * 10**missingDecimals;
0xleastwood (judge) commented:
Agree with issue and its severity.
minTotalAmountis affected by a change in a token’s decimals, leading to improper handling by the contract.
Not written yet. The AI write-up for this report has not been written yet. The Original tab links to the source.
How it worked
Root cause
The contracts assume all meta pool tokens have 18 decimals and sum their amounts directly without normalising, so the slippage calculation is incorrect when decimals differ.
Impact
If a meta token has more than 18 decimals, minting becomes unavailable; if it has fewer, slippage control is void and funds could be lost to excess slippage.
What the attacker needed
A meta pool token with decimals other than 18
The fix
The contracts should either enforce 18 decimals at construction time or normalise token amounts by their decimals in the minting calculation.
Explained by bugbounty.wiki with AI from the original and checked against quotes from it; it can still be wrong. Read the original before relying on a detail.
Not written yet. The AI write-up for this report has not been written yet. The Original tab links to the source.
Some tokens have different numbers of decimal places (like 6 or 8 instead of 18). The contracts add up token amounts without adjusting for these differences, so the slippage check (which protects against getting too little in return) becomes wrong. This can either stop people from minting or let them lose money to slippage.
What is Business logic?
The application works as coded but not as intended: a negative price, a skipped payment step, a limit that can be crossed.