Business logic Audit finding Intermediate

Multi-step campaign overrides are anchored to the original campaign, making later overrides impossible

The overrideCampaign function validates new overrides against the original campaign parameters rather than any previously stored override, so once a campaign has been overridden, later overrides are still constrained by the original start time and duration. This prevents creators from adjusting campaigns in multiple steps and causes transactions to revert with InvalidOverride even when the effective campaign has not yet started.

v2110 Follow with ahahaHard1k, araj and 6 others

Originally disclosed on Code4rena

Submitted by v2110, also found by ahahaHard1k, araj, arturtoros, drdee, kovacs7, peazzycole, phoenixV110, and slavina

Contract: DistributionCreator.sol #L237

overrideCampaign always validates a new override against the original campaign parameters stored in campaignList, not against any previously stored override. As a result, once a campaign has been overridden, any later override is still constrained by the original startTimestamp / duration, not by the latest override.

The override mechanism effectively becomes single-use in many realistic scenarios:

  1. Suppose a creator:
  2. Creates a campaign with startTimestamp = 1000, duration = 3600.
  3. Before the original start, calls overrideCampaign to move the start to 2000 and extend duration to 7200.
  4. Later, at block.timestamp = 1500, the creator (or operator) wants to adjust parameters again (e.g., tweak duration or start).

Because the validation is still comparing against the original: block.timestamp > _campaign.startTimestamp (1500 > 1000) is true.

If newCampaign.startTimestamp != _campaign.startTimestamp (e.g., 2000 vs original 1000), the condition: (newCampaign.startTimestamp != _campaign.startTimestamp && block.timestamp > _campaign.startTimestamp) becomes true and the transaction reverts with InvalidOverride.

Even though the effective campaign (in the off-chain engine) hasn’t started yet (new start at 2000), the contract refuses a new override due to the original start being in the past.

This leads to:

  • Creators being unable to adjust campaigns in multiple steps.
  • Operators seeing a revert even when, from a business perspective, the campaign should still be modifiable.

Given Merkl’s model where campaign creators should have flexible control over their campaigns, this is a meaningful functional break, not just cosmetic.

Recommended mitigation steps

Change overrideCampaign to validate against the effective campaign parameters:

  • When there is an override:

    CampaignParameters memory base = campaignOverrides[_campaignId].campaignId == _campaignId
    ? campaignOverrides[_campaignId]
    : campaignList[campaignLookup(_campaignId)];
    
  • Use base for all validation instead of the original campaignList entry.

  • This aligns on-chain constraints with how off-chain logic is expected to interpret campaigns.

View detailed Proof of Concept


The original report as published on Code4rena, by v2110. Images and videos are our own copies; raw HTML is shown as text. View it on Code4rena.

Not written yet. The AI write-up for this report has not been written yet. The Original tab links to the source.

How it worked

Root cause

Likely the override validation reads from the original campaignList entry instead of the latest stored override, so the original startTimestamp and duration remain the reference point for every subsequent override.

Impact

Creators and operators cannot adjust campaigns in multiple steps, and overrides may revert even when the effective campaign has not yet started, breaking expected flexible control.

What the attacker needed

Creator or operator role on a campaign; campaign has already been overridden once; original start time is in the past

The fix

overrideCampaign should validate against the effective campaign parameters, using the stored override when one exists and falling back to the original campaignList entry otherwise.

How it was found

  1. Create a campaign with a start timestamp and duration.
  2. Before the original start, call overrideCampaign to move the start later and extend the duration.
  3. Later, before the new start but after the original start, attempt another override to adjust parameters.
  4. The transaction reverts with InvalidOverride because validation still compares against the original start.

Explained by bugbounty.wiki with AI from the original and checked against quotes from it; it can still be wrong. Read the original before relying on a detail.

Not written yet. The AI write-up for this report has not been written yet. The Original tab links to the source.

A smart contract lets a campaign creator change a campaign's start time and duration by calling an override function. The bug is that the contract always checks the new values against the very first version of the campaign, not the most recent override. So after one change, a second change can be rejected even though the campaign has not actually started yet.

What is Business logic?

The application works as coded but not as intended: a negative price, a skipped payment step, a limit that can be crossed.

More by v2110

View all

1 more disclosed report, best first.

More from Merkl

View all

The newest disclosed reports for this program.

Similar reports

View all

Same bug class and techniques, clearest first.

Business logic flaws

The lesson behind this report.

The application works as coded but not as intended: a negative price, a skipped payment step, a limit that can be crossed.