Open and close handle the treasury's 4 bp fee differently under a VPI rebate: open credits the full fee, close nets the rebate against it, so the two paths disagree
The close path nets a skew-reducing VPI rebate against the 4 bp treasury execution fee, so the treasury is credited only the fee minus the rebate, while the open path credits the full fee and funds the rebate from pool cash. This reduces treasury revenue on every skew-reducing close, though no principal is lost and no attacker profits.
- Disclosed after under an hour
#97831 [SC-Medium] Open and close handle the treasury's 4 bp fee differently under a VPI rebate: open credits the full fee, close nets the rebate against it, so the two paths disagree
Submitted on Nov 3rd 2026 at 13:31:59 UTC by @Web3Vinay for Audit Competition | Plether
- Report ID: #97831
- Report Type: Smart Contract
- Report severity: Medium
- Target: https://github.com/immunefi-team/audit-comp-plether/tree/a82d4fefb02768e5b3bddcc97dee371eee24fea8/packages/perps/src
- Impacts:
- Contract fails to deliver promised returns, but doesn't lose value
Description
Brief/Intro
A voluntary close that reduces skew earns a negative VPI. _planCloseActionSettlement folds that negative VPI into one signed number together with the execution fee, spread and carry, and then caps the treasury fee at what the trader actually paid net. Nothing tops the fee back up afterwards. The open path does the opposite: it takes the full fee and funds the part the trader did not pay from pool free cash. So the same rebate costs the pool on open and costs the treasury on close.
The trigger is not limited to rebate > fee. Whenever a skew-reducing close earns any rebate, the treasury is credited fee − rebate (or 0 if rebate ≥ fee).
Plain Summary (and where the uncertainty is)
- Every trade pays a small fee (4 bp) that should go to the treasury.
- Some trades also earn a discount (the VPI rebate) for making the book more balanced.
- On open: the treasury gets the full fee. The discount is paid by the pool.
- On close: the discount is taken out of the fee. In the PoC the fee is 120 USDG, the discount is about 90, and the treasury gets only about 30.
- So the two paths do the same thing differently: on open the pool pays for the discount, on close the treasury does.
Vulnerability Details
Close path nets the rebate against the fee:
// CfdEnginePlanLib.sol:1041-1044
@> int256 actionNetAssets = cs.vpiDeltaAssets
+ int256(
cs.executionFeeAssets + cs.frozenSpreadAssets + delta.pendingCarryAssets - delta.realizedCarryAssets
);
The fee that reaches the treasury is capped by the net charge actually withheld or collected:
// CfdEnginePlanLib.sol:1062-1065
uint256 executionFeeEligibleAssets = nonClawbackWithheldAssets + nonVpiReserveCollectedAssets;
@> delta.executionFeeAssets =
cs.executionFeeAssets < executionFeeEligibleAssets ? cs.executionFeeAssets : executionFeeEligibleAssets;
The close top-up only covers executionFeeAssets − actionProtocolFeeCreditedAssets, i.e. the already-capped number, so the netted part is never restored:
// CfdEnginePlanLib.sol:984-987
@> uint256 feeTopUpAssets = delta.executionFeeAssets - delta.actionProtocolFeeCreditedAssets;
freePoolCashAssets =
_freePoolCashForProtocolFee(snap, delta, poolCashAfterCollectionsAssets, claimsAfterPriceNettingAssets);
delta.protocolFeeTopUpAssets = feeTopUpAssets < freePoolCashAssets ? feeTopUpAssets : freePoolCashAssets;
The open path does not net. tradeCostAssets = vpiAssets + executionFeeAssets (OpenAccountingLib.sol:135), but the shortfall against the full fee is topped up from pool free cash:
// CfdEnginePlanLib.sol:719-748
uint256 directlyCreditedAssets =
delta.tradeCostAssets > 0 ? Math.min(uint256(delta.tradeCostAssets), delta.executionFeeAssets) : 0;
...
@> uint256 feeShortfallAssets = delta.executionFeeAssets - directlyCreditedAssets;
uint256 topUpAssets = feeShortfallAssets == 0 ? 0 : Math.min(feeShortfallAssets, _freePoolCashAfterLiabilityReserves(...));
The spec says closes pay the fee and only cash-collected fees and free-cash-funded top-ups become treasury margin:
"voluntary closes pay the 4-basis-point treasury execution fee" (
WHITEPAPER.md:1455)"only cash-collected execution or liquidation fees and free-cash-funded top-ups become treasury margin" (
ACCOUNTING_SPEC.md:1118)
Impact Details
No user or LP funds are lost and no attacker profits. The invariant that does not hold: on a voluntary close the treasury receives the assessed 4 bp execution fee whenever cash or free pool cash can fund it.
- PoC ($300k long, full close, price unchanged): fee 120.000000 USDG, rebate 89.962396 USDG, treasury credited 30.037604 USDG. 89.962396 USDG (75 %) is not routed. On open, the same PoC credits the full 40 USDG fee to the treasury.
- Bound per close:
min(rebate, 4 bp × notional). At the deployed release parameters (vpiFactor 0.01e18,maxSkewRatio 0.4e18) on a 5M USDG pool, a $2M skew-reducing close earns a rebate of about 4,000 USDG, above the 800 USDG fee, so the whole fee is not credited. - Frequency: in a 3-actor, 40-step random open/close walk (512 runs), 824.95 of 2,120.93 USDG assessed close fees reached the treasury (61 % not routed). An earlier harness run showed 382.09 of 2,470.12 USDG (84.5 % not routed). This comes from my fuzz harness, not from the standalone PoC below.
- Conservation held in every run: Δtrader + Δtreasury + Δ(pool − claims) + Δkeeper = 0. The shortfall never exceeded
min(rebate, fee).
The effect is reduced treasury revenue on every skew-reducing close, not a loss of principal. Suggested label: Contract fails to deliver promised returns, but doesn't lose value
Mitigation
Make open and close behave the same: either fix close to credit the full fee (as open does), or change open to net the rebate against the fee (as close does) and document it.
Fix for close: top up the full assessed fee from pool free cash, as the open path does, so the rebate stays an LP-funded cost:
- uint256 feeTopUpAssets = delta.executionFeeAssets - delta.actionProtocolFeeCreditedAssets;
+ // top up against the assessed fee (cs.executionFeeAssets), not the net-capped fee
+ uint256 feeTopUpAssets = cs.executionFeeAssets - delta.actionProtocolFeeCreditedAssets;
References
packages/perps/src/libraries/CfdEnginePlanLib.sol:1041-1044: closeactionNetAssetsnets VPI against the feepackages/perps/src/libraries/CfdEnginePlanLib.sol:1062-1065: treasury fee capped at the net chargepackages/perps/src/libraries/CfdEnginePlanLib.sol:984-987: close top-up only covers the capped feepackages/perps/src/libraries/CfdEnginePlanLib.sol:719-748: open path tops the fee up from pool free cashpackages/perps/src/libraries/OpenAccountingLib.sol:135:tradeCostAssets = vpiAssets + executionFeeAssetspackages/perps/WHITEPAPER.md:1455: "voluntary closes pay the 4-basis-point treasury execution fee"packages/perps/WHITEPAPER.md:811, 1301: "only when cash credited"; "recovered action value is attributed to execution fee" (supports the intended-design reading)packages/perps/ACCOUNTING_SPEC.md:781-782, 1118-1119: top-up priority and treasury-margin rule
Proof of Concept
Proof of Concept
Conditions under which this is valuable
- A position is closed on the skew-reducing side, so the close earns a negative VPI. No special role, price move or timing is needed.
- Run on the repo's
BasePerpTestfixture at the deployed release parameters. A mainnet fork is not needed: the behaviour is deterministic engine accounting.
Save as packages/perps/test/lead2/RebateCloseFeeRouting.t.sol and run forge test --root packages/perps --offline --match-path test/lead2/RebateCloseFeeRouting.t.sol -vv.
// SPDX-License-Identifier: AGPL-3.0
pragma solidity 0.8.35;
import {BasePerpTest} from "../perps/BasePerpTest.sol";
import {CfdTypes} from "@plether/perps/CfdTypes.sol";
/// Deployed-release risk params (script/DeployPerpsArbitrumSepolia.s.sol:435-446), executionFeeBps = 4.
contract RebateCloseFeeRoutingPoC is BasePerpTest {
uint256 internal constant Q = 1e20; // 1 lot = 100 USD notional at price 1e8
address internal constant A = address(0xA11CE);
address internal constant B = address(0xB0B);
function _riskParams() internal pure override returns (CfdTypes.RiskParams memory) {
return CfdTypes.RiskParams({
vpiFactor: 0.01e18, maxSkewRatio: 0.4e18, maintMarginBps: 10, initMarginBps: 20, fadMarginBps: 300,
baseCarryBps: 500, minBountyAssets: 1e6, bountyBps: 10, keeperShareBps: 5000, protocolShareBps: 0
});
}
function _initialJuniorDeposit() internal pure override returns (uint256) {
return 5_000_000e6;
}
function _ord(address who, uint256 lots, uint256 margin, CfdTypes.Side side, bool isClose)
internal
view
returns (CfdTypes.Order memory)
{
return CfdTypes.Order({
account: who, sizeDelta: lots * Q, marginDelta: margin, targetPrice: 0,
commitTime: uint64(vm.getBlockTimestamp()), commitBlock: uint64(vm.getBlockNumber()),
orderId: 0, side: side, isClose: isClose
});
}
function _exec(CfdTypes.Order memory o) internal {
vm.warp(vm.getBlockTimestamp() + 1);
vm.roll(vm.getBlockNumber() + 1);
uint256 depth = pool.totalAssets();
vm.prank(address(router));
engine.processOrderTyped(o, 1e8, depth, uint64(vm.getBlockTimestamp()));
}
function test_CloseNetsVpiRebateAgainstTreasuryFee() public {
_fundTrader(A, 4_000_000e6);
_fundTrader(B, 4_000_000e6);
address treasury = engine.protocolTreasury();
// ---- Control: OPEN on the skew-reducing side. Rebate is paid, treasury still gets the FULL 4 bp fee.
_exec(_ord(A, 3000, 300_000e6, CfdTypes.Side.LONG, false)); // builds long skew
uint256 t0 = clearinghouse.balanceAssets(treasury);
_exec(_ord(B, 1000, 100_000e6, CfdTypes.Side.SHORT, false)); // short into long skew => VPI rebate
uint256 openFeeAssessed = (1000 * 100e6 * 4) / 10_000; // 4 bp of $100k = 40 USDG
uint256 openFeeCredited = clearinghouse.balanceAssets(treasury) - t0;
emit log_named_uint("OPEN fee assessed (6dp)", openFeeAssessed);
emit log_named_uint("OPEN fee credited to treasury (6dp)", openFeeCredited);
// ---- Close B, then close A. Closing A removes the long skew => VPI rebate.
_exec(_ord(B, 1000, 0, CfdTypes.Side.SHORT, true));
t0 = clearinghouse.balanceAssets(treasury);
uint256 poolBefore = pool.totalAssets();
_exec(_ord(A, 3000, 0, CfdTypes.Side.LONG, true)); // full close, same price 1e8
uint256 closeFeeAssessed = (3000 * 100e6 * 4) / 10_000; // 4 bp of $300k = 120 USDG
uint256 closeFeeCredited = clearinghouse.balanceAssets(treasury) - t0;
emit log_named_uint("CLOSE fee assessed (6dp)", closeFeeAssessed);
emit log_named_uint("CLOSE fee credited to treasury (6dp)", closeFeeCredited);
emit log_named_uint("CLOSE fee not routed to treasury (6dp)", closeFeeAssessed - closeFeeCredited);
emit log_named_int("pool totalAssets delta over close", int256(pool.totalAssets()) - int256(poolBefore));
assertEq(openFeeCredited, openFeeAssessed, "control: open routes full fee to treasury");
// Spec: "voluntary closes pay the 4-basis-point treasury execution fee" (WHITEPAPER.md:1455).
// Observed: the close credits LESS than the assessed fee, while the open path credited it in full.
assertLt(closeFeeCredited, closeFeeAssessed, "close credits less than the assessed fee");
assertGt(closeFeeAssessed - closeFeeCredited, (closeFeeAssessed * 7) / 10, "> 70% of the fee not routed");
}
}
Result (actually run, forge test --root packages/perps --offline --match-path test/lead2/RebateCloseFeeRouting.t.sol -vv):
Ran 1 test for test/lead2/RebateCloseFeeRouting.t.sol:RebateCloseFeeRoutingPoC
[PASS] test_CloseNetsVpiRebateAgainstTreasuryFee() (gas: 2195949)
Logs:
OPEN fee assessed (6dp): 40000000
OPEN fee credited to treasury (6dp): 40000000
CLOSE fee assessed (6dp): 120000000
CLOSE fee credited to treasury (6dp): 30037604
CLOSE fee not routed to treasury (6dp): 89962396
pool totalAssets delta over close: 0
Suite result: ok. 1 passed; 0 failed; 0 skipped
Reading the output: the open credits 40 of 40 USDG, the close credits 30.04 of 120 USDG. Asserting the spec reading (closeFeeCredited == closeFeeAssessed) fails with 30037604 != 120000000.
Not written yet. The AI write-up for this report has not been written yet. The Original tab links to the source.
How it worked
Root cause
Likely the close settlement folds the negative VPI rebate into the same signed net figure as the execution fee and then caps the treasury fee at that net amount, without topping it back up to the full assessed fee as the open path does.
Impact
Treasury revenue is reduced on every skew-reducing close, bounded by the smaller of the rebate and the 4 bp fee, but no user or LP principal is lost and no attacker profits.
What the attacker needed
A position on the skew-reducing side; no special role or timing needed
The fix
The close path should top up the full assessed fee from pool free cash, as the open path does, so the rebate stays an LP-funded cost.
How it was found
- Open a long position to build long skew.
- Open a short position against that skew so the open earns a VPI rebate, and observe the treasury still receives the full fee.
- Close the short position.
- Close the long position, which removes the long skew and earns a rebate, and observe the treasury receives less than the assessed fee.
Explained by bugbounty.wiki with AI from the original and checked against quotes from it; it can still be wrong. Read the original before relying on a detail.
Not written yet. The AI write-up for this report has not been written yet. The Original tab links to the source.
A trading protocol charges a small fee on each trade that is meant to go to its treasury. It also gives a discount to trades that make the book more balanced. The report shows that when a position is closed, the discount is subtracted from the fee before the treasury is paid, but when a position is opened the treasury still gets the whole fee. So the treasury quietly receives less money than the rules promise.
What is Business logic?
The application works as coded but not as intended: a negative price, a skipped payment step, a limit that can be crossed.